Close Menu
DemocracyGuyana.comDemocracyGuyana.com

    Subscribe to Updates

    Get the latest news from DemocracyGuyana.com

    What's Hot

    Berbice Port Financing Emerges as Key Factor in Guyana’s Refinery Plans

    September 20, 2026

    GPL Targets Major Reduction in Power Outages by Mid-2027 as $800M Upgrade Advances

    September 20, 2026

    Numbers Are Speaking

    September 20, 2026
    Facebook X (Twitter) Instagram
    • About DG
    • Join as Volunteers
    • Become a Member
    Facebook X (Twitter) Instagram YouTube TikTok
    DemocracyGuyana.comDemocracyGuyana.com
    Jet Global Airways
    Jet Global Airways
    • Home
    • Diaspora
    • Guyana News
    • Global News
    • Artificial Intelligence
    • Business Opportunities
    • Advertise with us
    • Photo Gallery
    • Videos
    • World Newspapers
    • Contact Us
    DemocracyGuyana.comDemocracyGuyana.com
    Home»Guyana Newsletter»US$35M Mackenzie-Wismar bridge to become fully operational by June- Min Edghill
    Guyana Newsletter

    US$35M Mackenzie-Wismar bridge to become fully operational by June- Min Edghill

    Guyana NewsletterBy Guyana NewsletterNo Comments2 Mins Read55,634 ViewsJanuary 10, 2026
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The US$35 million Mackenzie-Wismar bridge in Region 10 is on track to be completed and is expected to be fully operational by June, once the roads leading to it are connected.

    This was confirmed by Minister of Public Works Bishop Juan Edghill during a site inspection on Wednesday.

    The 220-metre-long precast bridge is being constructed by China Railway Construction (Caribbean) Co Ltd and is currently 93.2 per cent complete.

    Minister of Public Works Bishop Juan Edghill and senior engineer Patrick Thompson inspect the Mackenzie-Wismar bridge

    “Construction of the bridge will be completed on the deadline, the approach roads [will be ready] to provide full usage by the end of June. Everything will be done with all resources during the day and night to get the roads completed,” the public works minister stated.

    Minister Edghill stressed that while there is a desire to accelerate construction, quality and safety remain paramount to avoid jeopardising safety.

    The connecting roads leading to and from the bridge will be four lanes and will feature geo-carriageway, median and traffic islands.

    The design includes roundabouts on both sides, linking the bridge to the Linden–Mabura Road and the wider highway network.

    Layout of the Mackenzie-Wismar bridge project

    Minister Edghill stated that the aim is to ensure that all major infrastructure projects in Region Ten are seamlessly connected.

    “The Linden-Mabura Road, Linden-Soesdyke Highway, the bridge, we want everything to be connected at least in a respectable manner for a good drive, easy access and safety,” he emphasised.

    Structure of the Mackenzie-Wismar Bridge

    When completed, the bridge will provide lasting economic, social, and environmental benefits to residents and those travelling in and out of the mining town of Linden.

    Similar to other projects, the bridge will be toll-free, a policy decision by the President Dr Mohamed Irfaan Ali-led administration aimed at reducing travel costs and improving regional connectivity.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Guyana Newsletter
    Guyana Newsletter
    • Website

    Related Posts

    BIT training surpasses annual target

    NIS contributor base expands by 41% amid economic growth

    GECOM Region Four declarations inflated APNU+AFC votes by more than 20,000 above certified SoPs

    Port financing structure will determine refinery investment pace – Pres Ali

    Amerindian villages leading own development as $41B invested over five years

    Amerindian Heritage month gala sets stage for national pageant

    Leave A Reply Cancel Reply

    Top Posts

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024745K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Don't Miss

    Berbice Port Financing Emerges as Key Factor in Guyana’s Refinery Plans

    Guyana’s plans to establish a domestic oil refinery are closely linked to how the country…

    GPL Targets Major Reduction in Power Outages by Mid-2027 as $800M Upgrade Advances

    September 20, 2026

    Numbers Are Speaking

    September 20, 2026

    BIT training surpasses annual target

    September 20, 2026
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    72

    Over 50 poisoned at wedding in Iraq

    8.9

    EAM Jaishankar Meets Guyanese PM Mark Phillips, Discuss Energy, Disaster Resilience And Defence Cooperation

    Most Popular

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024745K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Our Picks

    Berbice Port Financing Emerges as Key Factor in Guyana’s Refinery Plans

    September 20, 2026

    GPL Targets Major Reduction in Power Outages by Mid-2027 as $800M Upgrade Advances

    September 20, 2026

    Numbers Are Speaking

    September 20, 2026
    Popular Categories
    • Global News
    • Election Rigging
    • Sports
    • Special News
    • Guyana and Private Tenders
    Do you want to associate with us
    • Business Opportunities
    • Advertise with us
    • Contact Us
    • www.democracyguyana.com Guyana – London – India

      For more information, contact us.
    DemocracyGuyana.com
    Facebook X (Twitter) Instagram YouTube TikTok
    • Home
    • About DG
    • Become a Member
    • Join as Volunteers
    • Forum
    • Advertise with us
    DG BRANCHES: GUYANA, USA, CANADA, UK, CARIBBEAN, AND INDIA
    © 2026 DemocracyGuyana.com.

    Type above and press Enter to search. Press Esc to cancel.