Close Menu
DemocracyGuyana.comDemocracyGuyana.com

    Subscribe to Updates

    Get the latest news from DemocracyGuyana.com

    What's Hot

    Smit Machchhar: Indian Pilot Praised for Saving Lives After Flydubai Cockpit Attack

    October 2, 2026

    The Nazi extermination machine was real

    October 2, 2026

    Ronaldo leaves Portugal camp amid reports of rift with coach Jorge Jesus

    October 1, 2026
    Facebook X (Twitter) Instagram
    • About DG
    • Join as Volunteers
    • Become a Member
    Facebook X (Twitter) Instagram YouTube TikTok
    DemocracyGuyana.comDemocracyGuyana.com
    Jet Global Airways
    Jet Global Airways
    • Home
    • Diaspora
    • Guyana News
    • Global News
    • Artificial Intelligence
    • Business Opportunities
    • Advertise with us
    • Photo Gallery
    • Videos
    • World Newspapers
    • Contact Us
    DemocracyGuyana.comDemocracyGuyana.com
    Home»Guyana Newsletter»Press Statement: Linden Electricity Company Inc. Addresses Recent Power Outages; Cites Unprecedented Demand Surge and El Niño Conditions
    Guyana Newsletter

    Press Statement: Linden Electricity Company Inc. Addresses Recent Power Outages; Cites Unprecedented Demand Surge and El Niño Conditions

    Guyana NewsletterBy Guyana NewsletterNo Comments3 Mins Read462 ViewsAugust 17, 2026
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The Linden Electricity Company Inc. (LECI) today issued a public statement to explain the intermittent power outages currently affecting the community, reassuring residents that the company is implementing immediate measures to manage the situation while long-term solutions are under development.

    The Cause of the Blackouts
    LECI confirms that the recent disruptions are due to a critical generation shortfall. The company’s current maximum available generation capacity stands at 14.5 Megawatts (MW) . However, over the past few weeks, the community’s peak demand has surged past the 15 MW threshold, outpacing the available supply.

    This rapid increase in demand is primarily attributed to the ongoing El Niño weather phenomenon, which has brought significantly higher-than-normal temperatures to the region. The extreme heat has led to a substantial uptick in the use of cooling equipment, particularly air conditioning units, placing unprecedented strain on the grid.

    A History of Growth
    LECI notes that prior to this weather-driven spike, the Linden community has already been experiencing consistent demand growth due to positive economic development, including the expansion of housing schemes and new business enterprises. While this growth is welcome news for the community, it has accelerated the timeline for required infrastructure upgrades.

    Long-Term Solutions Underway
    The Government of Guyana has been proactive in preparing for the community’s energy needs. A major 15 MW solar PV farm project is currently in the works to bolster Linden’s power supply. The first phase of this solar installation is scheduled for commissioning by the end of 2026. However, the unexpected and sudden demand surge driven by the El Niño weather pattern has arrived ahead of this scheduled deployment, creating a temporary gap between supply and consumption.

    Immediate Temporary Measures
    To prevent a total grid collapse and protect the system’s integrity, LECI has been forced to implement scheduled load-shedding (rolling blackouts) during peak demand periods. These outages are being carefully managed to rotate across the community, ensuring that no single area bears the burden for an extended period. The Government had requested, and got the general agreement of Linden sawmillers, to operate between the hours of 10:00 pm to 11:00 am daily, which is the period of lower demand.

    In addition, LECI is currently in active discussions with its generation supplier to secure additional, immediate generation capacity to bridge the gap until the solar farm comes online. The company is working diligently to find a solution that mitigates the inconvenience to residents as quickly as possible.

    A Call for Patience and Conservation
    LECI is appealing to consumers for their patience and understanding during this challenging period. The company is also urging all residents and businesses to assist in reducing the strain on the system by conserving electricity as much as possible.

    Residents are encouraged to:

    • Set air conditioning units to higher, energy-efficient temperatures.
    • Turn off lights and appliances when not in use.
    • Limit the use of high-energy appliances during peak daylight hours.

    The management of LECI understand the frustration that comes with power interruptions, and we sincerely apologize for the inconvenience. We are in a race against time to bridge this demand gap, and we are committed to keeping the community informed as we, with support from Government, work with our supplier to stabilize the grid.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Guyana Newsletter
    Guyana Newsletter
    • Website

    Related Posts

    Guyana expanding sustainable tourism certification

    Affected children from care facility to receive counselling, continuous care – Min Persaud

    Government investment brings AutoCAD training opportunities to New Amsterdam students

    Guyana hosts Global Aviation Safety Forum for the first time

    Government ready to finalise deal for major airline to use CJIA as global hub

    Lower Mazaruni Sees Surge in Infrastructure Upgrades Following President’s Outreach

    Leave A Reply Cancel Reply

    Top Posts

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024745K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Don't Miss

    Smit Machchhar: Indian Pilot Praised for Saving Lives After Flydubai Cockpit Attack

    Indian pilot Captain Smit Machchhar has received widespread praise after he reportedly thwarted an attack…

    The Nazi extermination machine was real

    October 2, 2026

    Ronaldo leaves Portugal camp amid reports of rift with coach Jorge Jesus

    October 1, 2026

    India to Face Pakistan in Asian Games 2026 Cricket Final

    October 1, 2026
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    72

    Over 50 poisoned at wedding in Iraq

    8.9

    EAM Jaishankar Meets Guyanese PM Mark Phillips, Discuss Energy, Disaster Resilience And Defence Cooperation

    Most Popular

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024745K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Our Picks

    Smit Machchhar: Indian Pilot Praised for Saving Lives After Flydubai Cockpit Attack

    October 2, 2026

    The Nazi extermination machine was real

    October 2, 2026

    Ronaldo leaves Portugal camp amid reports of rift with coach Jorge Jesus

    October 1, 2026
    Popular Categories
    • Global News
    • Election Rigging
    • Sports
    • Special News
    • Guyana and Private Tenders
    Do you want to associate with us
    • Business Opportunities
    • Advertise with us
    • Contact Us
    • www.democracyguyana.com Guyana – London – India

      For more information, contact us.
    DemocracyGuyana.com
    Facebook X (Twitter) Instagram YouTube TikTok
    • Home
    • About DG
    • Become a Member
    • Join as Volunteers
    • Forum
    • Advertise with us
    DG BRANCHES: GUYANA, USA, CANADA, UK, CARIBBEAN, AND INDIA
    © 2026 DemocracyGuyana.com.

    Type above and press Enter to search. Press Esc to cancel.