Close Menu
DemocracyGuyana.comDemocracyGuyana.com

    Subscribe to Updates

    Get the latest news from DemocracyGuyana.com

    What's Hot

    Seniors can cash $20,000 transportation vouchers at any post office on Wednesday

    July 8, 2026

    New market tarmac to receive 30 vendors from Agriculture Road

    July 8, 2026

    Sod-turning set for new markets within two weeks – Min Manickchand

    July 8, 2026
    Facebook X (Twitter) Instagram
    • About DG
    • Join as Volunteers
    • Become a Member
    Facebook X (Twitter) Instagram YouTube TikTok
    DemocracyGuyana.comDemocracyGuyana.com
    Jet Global Airways
    Jet Global Airways
    • Home
    • Diaspora
    • Guyana News
    • Global News
    • Artificial Intelligence
    • Business Opportunities
    • Advertise with us
    • Photo Gallery
    • Videos
    • World Newspapers
    • Contact Us
    DemocracyGuyana.comDemocracyGuyana.com
    Home»Featured»Gas-to-Energy transmission network reaches 99% completion
    Featured

    Gas-to-Energy transmission network reaches 99% completion

    Reporter Georgetown GuyanaBy Reporter Georgetown GuyanaNo Comments3 Mins Read2,550 ViewsJuly 8, 2026
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    As Guyana races toward a future powered increasingly by renewables, the country is first building a bridge, and that bridge is natural gas.

    Stretching across rivers, communities and industrial corridors, Guyana’s Gas-to-Energy transmission network is now 99 per cent complete, bringing the country a major step closer to delivering cheaper, more reliable electricity to homes and businesses.

    The update was provided exclusively to the Department of Public Information (DPI) by the Head of the Gas-to-Energy Taskforce and Consultant at the Ministry of Natural Resources, Winston Brassington.

    The transmission network can be thought of as the nation’s electrical highway system, designed to move power generated in Wales across the Demerara River and into communities and industries that depend on a stable supply.

    Winston Brassington, head of the Gas-to-Energy Taskforce and Consultant at the Ministry of Natural Resources

    Currently, the Guyana Power and Light Incorporated (GPL) imports a type of fuel known as Bunker C to generate electricity for the national grid.

    Once the Gas-to-Energy project becomes operational, electricity generated from natural gas will begin replacing expensive heavy fuel oil, which means less money out of consumers’ pockets.

    President Dr Mohamed Irfaan Ali has repeatedly described the Gas-to-Energy project as more than an energy investment, saying it is the foundation for Guyana’s transformation into a competitive, industrialised and low-carbon economy.

    “This is not simply about electricity; this is about creating opportunities, lowering costs and building prosperity,” the president had said previously while outlining the project’s national importance.

    The infrastructure now standing across Demerara gives a visible sense of that ambition.

    According to Brassington, crews have erected 370 transmission towers and poles and strung approximately 82 kilometres of power lines.

    Electrical towers along the East Bank of Demerara

    Among the most striking structures are four river-crossing towers spanning the Demerara River.

    Standing as high as 150 metres, these towers rise taller than many city skylines, roughly equivalent to stacking more than 40 storeys into the air, carrying electricity across the river through a double-circuit transmission system.

    The completed network includes a 230-kilovolt (kV) transmission backbone running from Wales to Goedverwagting, supported by additional 69 kV corridors extending across the West Bank, Georgetown, and the East Coast.

    Layout of where the transmission towers will connect

    Rather than each community generating electricity separately, the system functions like one connected circulatory network, carrying energy from a central source to where it is needed most.

    Three new substations and upgrades at Vreed-en-Hoop are also substantially advanced and will help distribute electricity efficiently across the Demerara-Berbice Integrated System.

    Brassington noted that procurement of transmission materials is completed, and the project has recorded more than two million safe man-hours without a fatality.

    When energised, the network will carry electricity from the new 300-megawatt power plant being developed in Wales.

    The government projections indicate the first gas turbine is expected to come online by the end of 2026, with all turbines commissioned by the first quarter of 2027 and full combined-cycle operations targeted by June 2027.

    The Gas-to-Energy project is expected to cut electricity costs by around half, reduce dependence on imported fuel and unlock new industrial opportunities.

    Featured Bottom Left
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Reporter Georgetown Guyana
    Reporter Georgetown Guyana
    • Website

    Related Posts

    Seniors can cash $20,000 transportation vouchers at any post office on Wednesday

    New market tarmac to receive 30 vendors from Agriculture Road

    Sod-turning set for new markets within two weeks – Min Manickchand

    36 graduate from BIT’s Commercial Food Preparation programme

    Region Three Rice Farmers receive over $201M in cash grants

    Guyana leads regional humanitarian effort as relief vessel departs for Venezuela

    Leave A Reply Cancel Reply

    Top Posts

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024744K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Don't Miss

    Seniors can cash $20,000 transportation vouchers at any post office on Wednesday

    Senior citizens in Guyana will be able to begin stamping and cashing their annual $20,000…

    New market tarmac to receive 30 vendors from Agriculture Road

    July 8, 2026

    Sod-turning set for new markets within two weeks – Min Manickchand

    July 8, 2026

    Gas-to-Energy transmission network reaches 99% completion

    July 8, 2026
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    72

    Over 50 poisoned at wedding in Iraq

    8.9

    EAM Jaishankar Meets Guyanese PM Mark Phillips, Discuss Energy, Disaster Resilience And Defence Cooperation

    Most Popular

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024744K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Our Picks

    Seniors can cash $20,000 transportation vouchers at any post office on Wednesday

    July 8, 2026

    New market tarmac to receive 30 vendors from Agriculture Road

    July 8, 2026

    Sod-turning set for new markets within two weeks – Min Manickchand

    July 8, 2026
    Popular Categories
    • Global News
    • Election Rigging
    • Sports
    • Special News
    • Guyana and Private Tenders
    Do you want to associate with us
    • Business Opportunities
    • Advertise with us
    • Contact Us
    • www.democracyguyana.com Guyana – London – India

      For more information, contact us.
    DemocracyGuyana.com
    Facebook X (Twitter) Instagram YouTube TikTok
    • Home
    • About DG
    • Become a Member
    • Join as Volunteers
    • Forum
    • Advertise with us
    DG BRANCHES: GUYANA, USA, CANADA, UK, CARIBBEAN, AND INDIA
    © 2026 DemocracyGuyana.com.

    Type above and press Enter to search. Press Esc to cancel.