Close Menu
DemocracyGuyana.comDemocracyGuyana.com

    Subscribe to Updates

    Get the latest news from DemocracyGuyana.com

    What's Hot

    An Unspeakable Tragedy

    July 21, 2026

    53 rescued as gov’t leads extensive search operation following MV Barima capsizing

    July 20, 2026

    Update: 67 people, including 15 children rescued from MV Barima

    July 20, 2026
    Facebook X (Twitter) Instagram
    • About DG
    • Join as Volunteers
    • Become a Member
    Facebook X (Twitter) Instagram YouTube TikTok
    DemocracyGuyana.comDemocracyGuyana.com
    Jet Global Airways
    Jet Global Airways
    • Home
    • Diaspora
    • Guyana News
    • Global News
    • Artificial Intelligence
    • Business Opportunities
    • Advertise with us
    • Photo Gallery
    • Videos
    • World Newspapers
    • Contact Us
    DemocracyGuyana.comDemocracyGuyana.com
    Home»Guyana Newsletter»Gas-to-Energy project enters final phase
    Guyana Newsletter

    Gas-to-Energy project enters final phase

    Guyana NewsletterBy Guyana NewsletterNo Comments3 Mins Read446 ViewsJune 26, 2026
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email
    -as Guyana targets power generation by December

    Guyana’s transformative Gas-to-Energy project has entered a decisive stage, with engineers now preparing to introduce natural gas into the system and working around the clock to deliver electricity generation by December 2026.

    This update was provided by Project Manager of Linsayca, Mr Luis Pirela, during a site visit on Wednesday by Jamaica’s Prime Minister Andrew Holness, accompanied by Prime Minister Brigadier (Ret’d) Mark Phillips, Minister of Natural Resources Vickram Bharrat, and Minister of Public Utilities and Aviation Deodat Indar.

    Jamaica’s Prime Minister Andrew Holness, accompanied by Prime Minister Brigadier (Ret’d) Mark Phillips, Minister of Natural Resources Vickram Bharrat, and Minister of Public Works and Aviation Deodat Indar and officials of Linsayca

    Pirela outlined the complex process underway at the Wales Development Zone. He explained that the facility is designed to receive natural gas and separate it into different components to maximise value for Guyana.

    At the centre of the operation is methane, the primary gas component that will be used to fuel power generation and supply electricity to homes and businesses.

    “The facility separates the molecules and extracts methane, which is then sent to the power generation system as fuel,” Pirela explained during the tour.

    But electricity is only part of the equation.

    The remaining gas components are condensed into liquids that can be recovered and stored for future use. These by-products can support a range of downstream industries including cooking gas and plastics manufacturing, creating opportunities for future industrial expansion.

    Pirela explained that the project brings together expertise and equipment from approximately 20 countries across Europe, Asia and the Americas.

    According to him, the international collaboration allowed the engineering teams to deliver the project within an accelerated timeframe.

    “This facility is the result of integrating engineering and equipment from around the world,” he noted.

    He further revealed that the current construction works represent the second phase of development.

    The plant is being designed with operational flexibility, allowing it to run initially in a simple-cycle mode and later transition into a combined-cycle system that captures hot exhaust gases to produce additional electricity more efficiently.

    Construction of the second phase is expected to conclude within the next three months, after which the turbines will be fully assembled.

    “The target is to start power generation in December 2026,” Pirela stated.

    To meet that deadline, he said teams are maintaining continuous operations.

    “We’re working 24 hours a day, seven days a week, including holidays, to make sure this is achievable and to deliver power generation for Guyana.”

    The gas processing facility is initially designed to handle 50 million standard cubic feet of gas per day, with infrastructure already installed to expand capacity to 120 million standard cubic feet daily in the future.

    Pirela said the site is now technically prepared for gas introduction, with commissioning activities advancing.

    “We’re ready for introducing gas and supporting the commissioning teams, with the hope of introducing gas later this year,” he added.

    Once completed, the Gas-to-Energy project is expected to significantly reduce electricity costs, strengthen energy security and open new opportunities for industrial development in Guyana.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Guyana Newsletter
    Guyana Newsletter
    • Website

    Related Posts

    53 rescued as gov’t leads extensive search operation following MV Barima capsizing

    Update: 67 people, including 15 children rescued from MV Barima

    Statement by Prime Minister Mark Phillips on the incident involving the MV Marima on it’s journey to Port Kaituma, Region One

    Government stands with families as support continues following MV Barima incident

    Guyana strengthens regional fight against financial crime

    Guyana’s law school will eliminate Guyanese student admission limits

    Leave A Reply Cancel Reply

    Top Posts

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024744K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Don't Miss

    An Unspeakable Tragedy

    GUYANA and the world woke up yesterday morning to the news that the MV Barima had…

    53 rescued as gov’t leads extensive search operation following MV Barima capsizing

    July 20, 2026

    Update: 67 people, including 15 children rescued from MV Barima

    July 20, 2026

    Statement by Prime Minister Mark Phillips on the incident involving the MV Marima on it’s journey to Port Kaituma, Region One

    July 20, 2026
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    72

    Over 50 poisoned at wedding in Iraq

    8.9

    EAM Jaishankar Meets Guyanese PM Mark Phillips, Discuss Energy, Disaster Resilience And Defence Cooperation

    Most Popular

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024744K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Our Picks

    An Unspeakable Tragedy

    July 21, 2026

    53 rescued as gov’t leads extensive search operation following MV Barima capsizing

    July 20, 2026

    Update: 67 people, including 15 children rescued from MV Barima

    July 20, 2026
    Popular Categories
    • Global News
    • Election Rigging
    • Sports
    • Special News
    • Guyana and Private Tenders
    Do you want to associate with us
    • Business Opportunities
    • Advertise with us
    • Contact Us
    • www.democracyguyana.com Guyana – London – India

      For more information, contact us.
    DemocracyGuyana.com
    Facebook X (Twitter) Instagram YouTube TikTok
    • Home
    • About DG
    • Become a Member
    • Join as Volunteers
    • Forum
    • Advertise with us
    DG BRANCHES: GUYANA, USA, CANADA, UK, CARIBBEAN, AND INDIA
    © 2026 DemocracyGuyana.com.

    Type above and press Enter to search. Press Esc to cancel.