Close Menu
DemocracyGuyana.comDemocracyGuyana.com

    Subscribe to Updates

    Get the latest news from DemocracyGuyana.com

    What's Hot

    Guyana’s Emerging Gas Industry Set to Create Major Opportunities for Local Businesses

    November 10, 2026

    There is no secrecy: Guyana needs more exploration

    November 10, 2026

    AFC at 21: Some more notes

    November 9, 2026
    Facebook X (Twitter) Instagram
    • About DG
    • Join as Volunteers
    • Become a Member
    Facebook X (Twitter) Instagram YouTube TikTok
    DemocracyGuyana.comDemocracyGuyana.com
    Jet Global Airways
    Jet Global Airways
    • Home
    • Diaspora
    • Guyana News
    • Global News
    • Artificial Intelligence
    • Business Opportunities
    • Advertise with us
    • Photo Gallery
    • Videos
    • World Newspapers
    • Contact Us
    DemocracyGuyana.comDemocracyGuyana.com
    Home»Featured»There is no secrecy: Guyana needs more exploration
    Featured

    There is no secrecy: Guyana needs more exploration

    Joel BhagwandinBy Joel BhagwandinNo Comments5 Mins Read4,346 ViewsNovember 10, 2026
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
    Joel Bhagwandin
    Joel Bhagwandin
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Opposition MP K. Sharma Solomon has framed ExxonMobil’s latest exploration permit for Jacunda-1 as a cause for concern. The mistake is in the framing. The permit is what I have has urged for months: pushing exploration ahead while Guyana’s current fields are still producing at their peak.
    My September 2026 model of the Stabroek Block fiscal regime tracks production, Government receipts, cost recovery and Natural Resource Fund (NRF) growth from 2027 to 2051. The data suggests Guyana needs more exploration, not less.
    Resource replacement must begin before Stabroek’s decline materially narrows the petroleum-revenue base. Stabroek’s production plateau is substantial, but finite. The screening case reaches 1.3mn bpd in 2028 and holds through 2040, then falls to about 1.13mn bpd in 2041, 783 kbpd in 2046 and 114 kbpd by 2051. Optimization can extend the tail. It cannot replace exhausted barrels. Guyana should accelerate exploration and begin preparing another transparent, competitive offshore bid round.
    1. The high-production years will end
    The base case starts from about 11 billion barrels of oil equivalent, with roughly 1.2 billion produced before 2026. Without new resources, the model runs out in 2054. These are screening scenarios, not certified reserves and not an ExxonMobil forecast. It takes years to get from discovery to first oil. Waiting for production to fall before stepping up exploration means starting too late, because once the plateau ends, Guyana’s oil revenue depends on finding, appraising and developing new resources. That is what this permit is for. The MP’s concern, if followed, would slow the very activity that protects future revenue.
    2. There is no secrecy
    A discovery is not proved reserves. Appraisal drilling, reservoir modelling and commercial assessment take time, and an unchanged public resource estimate reflects that, not concealment.
    Appraisal also diverts rigs, money and technical capacity from finding and producing more oil. An operator with this many attractive projects in hand is right to put exploration and production first, while appraising where contracts or development applications require it. How significant Rockhead-1 turns out to be will depend on the appraisal results, not on when it was announced.
    Time is also short. An exploration licence has a finite life, and about one-third of the Stabroek Block is currently in force majeure. With the clock running and part of the block already constrained, every rig diverted from exploration costs Guyana future revenue.
    3. Cost recovery is not automatic fiscal loss
    Guyana put up no capital, so it cannot lose any. The MP’s claim that cost recovery is a loss to Guyana fails on first principles: a loss requires capital at risk. Under the 2016 Production Sharing Agreement, the contractor funds and carries all exploration spending. If a well is dry, ExxonMobil and its partners absorb the full cost. Cost recovery is the contractor getting back its own money, through cost oil, within a ceiling and subject to verification. Guyana still receives royalty, and profit oil is split equally between the Government and the contractor. At most, recovery affects when the Government is paid. It cannot leave Guyana poorer than before the well was drilled.
    No capital, no risk, no loss. Our model also found that a project-level ring fence could raise the present value of Government receipts if the development schedule stayed the same, but that gain could disappear if it delayed production. Timing is the only real question, and delayed exploration makes it worse.
    4. The scale of what is at stake
    In the base case, the Government collects about US$186.4 billion in petroleum receipts from 2027 to 2051. Of that, US$105.6 billion goes to the Treasury, and the NRF reaches about US$109.6 billion in real terms by 2051. The effective Government take is about 35.7%. These figures depend on the model’s assumptions, but they show the scale at stake. New discoveries could extend the production horizon. A long pause in exploration would leave Guyana with few options once today’s fields mature.
    5. Exploration is also a strategic imperative
    Suriname is moving ahead offshore. Trinidad and Tobago is looking to monetise regional gas. Venezuela’s oil sector is repositioning, and major powers are competing for energy influence. Guyana’s offshore industry is strengthening its ties with the United States while also drawing Chinese investment through CNOOC. Guyana should deepen those relationships without giving up its own decision-making, and a larger offshore industry needs better maritime surveillance and emergency response.
    6. A permit is not a loss
    A natural-resource information system is only useful if it keeps permits, work programmes, discoveries, contingent resources, certified reserves, sanctioned developments, recoverable costs and actual receipts separate. They are different stages of the process. Blurring them leaves the false impression that every permit costs Guyana money.
    The challenge for Guyana is no longer just finding oil. It is sustaining production and revenue once the early discoveries are spent. Any debate on the oil sector should start from depletion, the fiscal terms and the regional competition for investment. The real danger is not that ExxonMobil keeps exploring. It is that Guyana reaches production decline without the next round of discoveries ready to take over.
    Slowing the search for oil is the real risk to the country’s future revenue.

    Featured Bottom Left
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Joel Bhagwandin
    Joel Bhagwandin

    Related Posts

    Guyana’s Emerging Gas Industry Set to Create Major Opportunities for Local Businesses

    AFC at 21: Some more notes

    Politics must not shield anyone

    Diwali Motorcade brings generations together in celebration of Guyana’s cultural diversity and traditions

    EPA Warns of Increased Fire Risks Across Guyana Amid Rising Temperatures

    Government Targets Sustainable Village Economies Across All Amerindian Communities – Finance Minister

    Leave A Reply Cancel Reply

    Top Posts

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024745K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Don't Miss

    Guyana’s Emerging Gas Industry Set to Create Major Opportunities for Local Businesses

    Guyana’s expanding natural gas ambitions are expected to open a new chapter of economic opportunity,…

    There is no secrecy: Guyana needs more exploration

    November 10, 2026

    AFC at 21: Some more notes

    November 9, 2026

    Politics must not shield anyone

    November 8, 2026
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    72

    Over 50 poisoned at wedding in Iraq

    8.9

    EAM Jaishankar Meets Guyanese PM Mark Phillips, Discuss Energy, Disaster Resilience And Defence Cooperation

    Most Popular

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024745K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Our Picks

    Guyana’s Emerging Gas Industry Set to Create Major Opportunities for Local Businesses

    November 10, 2026

    There is no secrecy: Guyana needs more exploration

    November 10, 2026

    AFC at 21: Some more notes

    November 9, 2026
    Popular Categories
    • Global News
    • Election Rigging
    • Sports
    • Special News
    • Guyana and Private Tenders
    Do you want to associate with us
    • Business Opportunities
    • Advertise with us
    • Contact Us
    • www.democracyguyana.com Guyana – London – India

      For more information, contact us.
    DemocracyGuyana.com
    Facebook X (Twitter) Instagram YouTube TikTok
    • Home
    • About DG
    • Become a Member
    • Join as Volunteers
    • Forum
    • Advertise with us
    DG BRANCHES: GUYANA, USA, CANADA, UK, CARIBBEAN, AND INDIA
    © 2026 DemocracyGuyana.com.

    Type above and press Enter to search. Press Esc to cancel.