Close Menu
DemocracyGuyana.comDemocracyGuyana.com

    Subscribe to Updates

    Get the latest news from DemocracyGuyana.com

    What's Hot

    GPL explores new-generation capacity as peak demand climbs to 255MW

    September 21, 2026

    The PNC approach to opposition will keep them in small third-party mode

    September 21, 2026

    Berbice Port Financing Emerges as Key Factor in Guyana’s Refinery Plans

    September 20, 2026
    Facebook X (Twitter) Instagram
    • About DG
    • Join as Volunteers
    • Become a Member
    Facebook X (Twitter) Instagram YouTube TikTok
    DemocracyGuyana.comDemocracyGuyana.com
    Jet Global Airways
    Jet Global Airways
    • Home
    • Diaspora
    • Guyana News
    • Global News
    • Artificial Intelligence
    • Business Opportunities
    • Advertise with us
    • Photo Gallery
    • Videos
    • World Newspapers
    • Contact Us
    DemocracyGuyana.comDemocracyGuyana.com
    Home»Guyana Newsletter»Works underway to reduce flooding at Buxton/St Joseph Housing Schemes
    Guyana Newsletter

    Works underway to reduce flooding at Buxton/St Joseph Housing Schemes

    Guyana NewsletterBy Guyana NewsletterNo Comments2 Mins Read53,530 ViewsJanuary 20, 2026
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    People who received house lots at the Buxton/St Joseph Housing Schemes in Region Two will soon be able to access their land, thanks to an ambitious new drainage and irrigation project.

    The National Drainage and Irrigation Authority (NDIA) has already finalised a comprehensive drainage plan for the area. It will be implemented in two phases to improve water management and reduce flooding risks.

    An excavator conducting drainage works

    The drainage project is expected to commence in two weeks, with the first phase involving the construction of approximately 0.7 kilometres of drainage channels and related structures to facilitate proper discharge from the housing scheme into existing ponds.

    The project, valued at $44.2 million, has been awarded to Triple A General Contracting Services.

    The second phase of work aims to strengthen irrigation capacity in the area. It includes the installation of an 80-cusec mobile pump, which is designed to discharge water from the drainage channel into the Pomeroon River.

    Minister of Housing Collin Croal engages residents in Region Two

    Minister of Housing Collin Croal said during a visit last Friday that the pump will arrive and be installed by the end of February, and a contract for it has already been signed.

    When both phases are completed, residents can expect significant improvements.

    “We’re looking for no later than three months from today to be able to permanently address the waterlogging, the flooding, or the accumulation of water that is causing flooding,” the minister stated.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Guyana Newsletter
    Guyana Newsletter
    • Website

    Related Posts

    BIT training surpasses annual target

    NIS contributor base expands by 41% amid economic growth

    GECOM Region Four declarations inflated APNU+AFC votes by more than 20,000 above certified SoPs

    Port financing structure will determine refinery investment pace – Pres Ali

    Amerindian villages leading own development as $41B invested over five years

    Amerindian Heritage month gala sets stage for national pageant

    Leave A Reply Cancel Reply

    Top Posts

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024745K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Don't Miss

    GPL explores new-generation capacity as peak demand climbs to 255MW

    Guyana Power and Light (GPL) is exploring additional electricity generation options as rapidly rising demand…

    The PNC approach to opposition will keep them in small third-party mode

    September 21, 2026

    Berbice Port Financing Emerges as Key Factor in Guyana’s Refinery Plans

    September 20, 2026

    GPL Targets Major Reduction in Power Outages by Mid-2027 as $800M Upgrade Advances

    September 20, 2026
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    72

    Over 50 poisoned at wedding in Iraq

    8.9

    EAM Jaishankar Meets Guyanese PM Mark Phillips, Discuss Energy, Disaster Resilience And Defence Cooperation

    Most Popular

    The Hollow Ambitions of Nigel Hughes: A Political Opportunist and Exhibitionist with Empty Promises.

    July 11, 2024980K Views

    What do you make of it? by Leonard Craig

    November 18, 2024745K Views

    President Irfaan Ali Emphasises Discipline and Accountability Over Project Delays

    November 13, 2024566K Views
    Our Picks

    GPL explores new-generation capacity as peak demand climbs to 255MW

    September 21, 2026

    The PNC approach to opposition will keep them in small third-party mode

    September 21, 2026

    Berbice Port Financing Emerges as Key Factor in Guyana’s Refinery Plans

    September 20, 2026
    Popular Categories
    • Global News
    • Election Rigging
    • Sports
    • Special News
    • Guyana and Private Tenders
    Do you want to associate with us
    • Business Opportunities
    • Advertise with us
    • Contact Us
    • www.democracyguyana.com Guyana – London – India

      For more information, contact us.
    DemocracyGuyana.com
    Facebook X (Twitter) Instagram YouTube TikTok
    • Home
    • About DG
    • Become a Member
    • Join as Volunteers
    • Forum
    • Advertise with us
    DG BRANCHES: GUYANA, USA, CANADA, UK, CARIBBEAN, AND INDIA
    © 2026 DemocracyGuyana.com.

    Type above and press Enter to search. Press Esc to cancel.